Hotel operations
Hotel supplies receiving checklist: count, inspect and record
Check hotel supply deliveries against the order, count individual units, separate damage from shortages and record partial acceptance before updating stock.

The short answer
Compare the delivery with the confirmed order, count the agreed units and inspect the actual items. Record ordered, delivered and accepted quantities separately, with shortages and rejected pieces identified. Notify the supplier, add only accepted items to usable stock and keep unresolved quantities open until a checked replacement or agreed adjustment closes them.
A carton arriving at reception does not establish that the hotel received everything it ordered. The carton may contain fewer towels, a different size or damaged pieces. A delivery signature and an invoice also cannot replace a physical check. The receiving record should explain what arrived, what was accepted and what still needs resolving.
This practical method is for reception, housekeeping and storeroom colleagues receiving non-food supplies such as towels, slippers and guest stationery. Start with the confirmed purchase from the supplier selection process; pricing and supplier comparison belong before delivery.
Prepare the order and a responsible receiver
Keep the order reference, item specification, agreed quantity and delivery contact accessible. Name a receiver and a colleague who can approve exceptions. If reception is busy with guests, arrange another employee to check the delivery; do not turn an unchecked carton into an accepted quantity merely to clear the desk.
SAP’s receiving guidance distinguishes actual receipts, partial receipts and damaged goods. The checklist here is an original hotel procedure, not a description of BirOtel functionality.
Use a line for each item and size. Record the delivery date, supplier, order reference, delivery-note reference and receiver. The ordered quantity is a comparison value, not a count.
Count pieces and inspect the agreed item
Check that the delivery is intended for your hotel and relates to the correct order. Compare product code or description, size, colour and any approved sample. A similar-looking towel is not automatically an approved substitute.
Count in the unit used on the order. If the order says 40 individual towels, “two cartons” is insufficient. Open and count the contents according to the hotel’s agreed receiving procedure. If the order uses packs, record both the pack count and confirmed pieces per pack so later stock entries use consistent units.
Look for visible damage and differences from the agreed specification. Note the affected quantities and photograph relevant defects where useful, keeping the item reference identifiable. Ask an authorised colleague to decide uncertain cases. Until that decision, label the quantity awaiting inspection and exclude it from usable stock.
| Receiving check | Record before completion |
|---|---|
| Correct order and item | Reference, description, size and agreed unit |
| Physical count | Actual delivered quantity for each line |
| Condition and specification | Accepted, rejected and awaiting-inspection quantities |
| Difference from order | Missing pieces and unapproved substitutions |
| Follow-up | Supplier contact, action owner and next review time |
Keep shortages separate from rejected pieces
Hypothetical example: the hotel ordered 40 bath towels. The receiver counts 38 delivered towels; 2 of those have visible tears. The hotel accepts 36 and rejects the 2 damaged pieces. Another 2 never arrived.
| Quantity category | Towels |
|---|---|
| Ordered | 40 |
| Delivered | 38 |
| Accepted into usable stock | 36 |
| Delivered but rejected | 2 |
| Missing from delivery | 2 |
The checks reconcile: 38 = 36 + 2, and 40 = 38 + 2. Four acceptable towels remain outstanding if the agreed order stays at 40: two replacements for rejected pieces and two missing pieces. Do not describe all four as missing, or record 40 as received because that quantity appears on the delivery note.
Label and separate the rejected pieces pending the agreed return or replacement arrangement. Their physical presence in the building does not make them available to housekeeping. If they leave with the driver, record that movement and the acknowledgement obtained.
Record partial acceptance and contact the supplier
Record the 36 accepted pieces as a partial receipt. Preserve the original order quantity and attach the discrepancy details. Before acknowledging delivery, make clear what the acknowledgement covers under the hotel’s agreed procedure; do not confirm a full, satisfactory receipt before inspection.
Use a short message such as this original example:
Order [reference], delivery [date]: 40 bath towels ordered; 38 delivered. We accepted 36 and rejected 2 with visible tears; 2 are missing. Photos and the count record are attached. Please confirm arrangements for the damaged pieces, supply of the four outstanding acceptable towels, and the expected delivery date. Our contact is [name].
Keep the supplier’s response with the record. A promise of replacements is pending work. When another delivery arrives, count and inspect it as a new receipt linked to the original order; do not count returned rejected pieces as accepted stock.
Put away accepted stock and close the differences
Record the location and add only the accepted quantity to the stock sheet. For linen, continue with the separate linen inventory method. Pass unresolved quantities, commitments and responsibility into the shift handover.
Send the receiving record to the colleague checking invoices. An invoice is a request for payment, not proof of delivery. Close discrepancies only after verified supply or an authorised, documented adjustment.
Frequently asked questions
Can the delivery-note quantity be copied into stock?
Only after the actual count and acceptance support it. Record differences explicitly.
What if nobody can inspect immediately?
Record arrival and the pending inspection, assign an owner and keep the goods outside usable stock until checked.
Does a supplier promise close the shortage?
No. Keep it open until the promised goods pass receiving checks or an authorised adjustment resolves the balance.
These guides are published by BirOtel. General methods, illustrative examples and current product capabilities are identified separately. Sources appear beside the relevant explanations.
[email protected]Explore these workflows for your own hotel
Use your room inventory and daily tasks to assess whether BirOtel fits your hotel in a live demo.

